0512-5328-8808
Information

Your position: Home > News > Information

NewsNews & Trends

Optical Inspection Equipment
2024-08-27 10:34:12
times

Installation of nut image screening machine is not as simple as we think, not only need to know what must be done before the installation of nut image screening machine, but also need to understand the installation of nut image screening machine notes, the following optical inspection equipment Minrui automation to tell you about it.


1, when installing the motor and triangular tape, the base of the motor should be leveled, the level of the motor needs to be corrected, the center line of the two tape wheels corresponding to the groove should be overlapped, and the tension of the triangular tape should be appropriate;


2、Check the fixing of each connecting part of the sieve, and the sieve mesh should be tightened evenly to prevent local vibration;


3、Check the lubrication of the transmission part, whether the wiring of the motor and the control box is correct, and rotate the transmission part by hand to see whether the operation is normal;


label

Copyright © Taicang Minjui Automation Technology Co., Ltd